Solar Panel Arrays
4 Panel 2 Axis
Introduction
Major Axis The connection between the Main Supports (see Upper Structure) and the Main Post be...
Material List
QTY (EA) QTY (BULK) PN Vendor DESCRIPTION COST (EA) COST (BULK) EXT (EA) Gene...
Base Structure
Simple Buried Base Dig a 2-3ft post hole and insert a 6x6 8ft post. Refill with dirt while ch...
Upper Structure
Cut Lengths Worksheet Use the worksheet below to calculate board cut lengths relative to the len...